Thursday, April 25, 2019

Southwark Cathedral Millennium Project Essay Example | Topics and Well Written Essays - 1750 words

Southwark Cathedral millennium Project - search ExampleThe history of the Southwark Cathedral Millennium Project goes back as far as 1930 when it was premier(prenominal) initiated. The main objective of this learn was to create an environment that would be good enough to meet the emerge needs of not only the congregation, but besides the visitors and staff. The financial support for this project came mainly from the Millennium Commission. The plans for the project included the construction of a new library building, refectory and shop. The exhibition space was also anticipate to be expanded under the Southwark Cathedral Millennium Project (Millennium Commission, 2010). As part of the project, the old buildings were also supposed to be upgraded and the surrounding environment which was degrading at the time was expected to be improved. In 1997, London-based architects, Elizabeth Banks Associates, were given the responsibility of redesigning the cathedral grounds with the help a nd recommendation of Richard Griffiths Associates, who were the lead architect of the establishment. The upgrading and improvements were finally undefiled in 2001 (Commission for Architecture and the Built Environment, 2011). The result was a recast churchyard and an improved access for the disabled. thither were also new improved garden spaces and a public square which is found on the northern side of the cathedral. New refectory building and visitor centres were also added as part of the project. The project cost a total of 10,682,738 pounds and it was seen as part of the wider scheme of regenerating the south bank of the River Thames (Millennium Commission, 2010). Figure one on a lower floor shows the Southwark Cathedral. Fig 1 Southwark Cathedral Courtesy of Anglican Mainstram OGC Gateway Review Model This project polish will follow the OGC Gateway Review Model, which is designed to confirm whether or not the expected benefits of a project have been achieved and operations ar e running smoothly. This review model is based on six main aspects. These are review of operating phase, business case and benefits management, plans for ongoing improvements in value for money, plans for ongoing improvements in performance and innovation, review of organizational learning and maturity targets and readiness for the future (Office of Government Commerce, 2010). In 1997, Elizabeth Banks Associates (EBA) was given the task of working on the Southwark project after a recommendation by the official architects of the Cathedral, Richard Griffiths Architects. The other project team members included Max Fordham Associates who were in charge of the services, Alan Baxter Associates as the structural engineers, Citex were the project managers, Bucknall Austin were the quantity surveyors while the Pre-construction Archaeology provided Archaeological surveying services. Sutton Vane Associates were in charge of ignition throughout the project duration. Their main

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.